TCC2/ TCC2P card support

The nodes with the TCC2/TCC2P cards in releases prior to R10.6.2 cannot be upgraded to R10.6.2 as the size of the software package exceeds the size of the TCC2/TCC2P flash drive. Hence, R10.6.2 does not have the TCC2/TCC2P software package. If the user wants to continue with the ONS 15454 chassis, it is recommended to use the TCC3 control card. If the user wants to upgrade to a ONS 15454 M6 or NCS 2015 chassis, it is recommended to use the TNCS or TNCS-O control cards.

Errorless Upgrades and Exceptions

This section describes important information to be aware of before you begin the upgrade process:

  • During an upgrade from R8.5.x, R9.0, or R9.1 to R9.2.x or later releases, a loss of Gigabit Ethernet traffic of up to one second is incurred. This traffic loss occurs when auto-negotiation is disabled on the far end of the ADM-10G card. If the node has a path protection circuit, a path protection switchover occurs. To avoid this switchover during an upgrade, perform the path protection lockout procedure before upgrading the software. Note, however, this procedure does not help avoid hits in the flow of traffic.

  • During a revert procedure, if Gigabit Ethernet traffic is not flowing or GFP alarms are present on an ADM-10G card, hard-reset the ADM-10G card to ensure smooth traffic flow.

Document Procedures

Procedures in this document must be performed in consecutive order unless noted otherwise. Ensure that the procedure is completed for each node in a given network. If you are new to upgrading the software, make a printed copy of this document and use it as a checklist.

Each non-trouble procedure (NTP) is a list of steps designed to accomplish a specific procedure. Follow the steps until the procedure is complete. If you need more detailed instructions, refer to the detail-level procedure (DLP) specified in the procedure steps. Throughout this guide, NTPs are referred as “procedures” and DLPs as “tasks.” Every reference to a procedure includes its NTP number, and every reference to a task includes its DLP number.

The DLP (task) supplies additional task details to support the NTP. The DLP lists numbered steps that lead you through completion of a task. Some steps require that equipment indications be checked for verification. When a proper response is not obtained, a trouble clearing reference is provided.

This section lists the document procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).

  1. NTP-U487 Preparing to Upgrade to a New Release—This procedure contains critical information and tasks that you must read and complete before beginning the upgrade process.

  2. NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database—Complete the database backup to ensure that you have preserved your node and network provisioning in the event that you need to restore them.

  3. NTP-U489 Upgrade the Cisco ONS 15454 SDH Software—Complete this procedure to complete the upgrade.

  4. NTP-U490 Install Public-Key Security Certificate— Complete this procedure to be able to run the software.

  5. NTP-U491 Restore the Previous Software Load and Database— Complete this procedure if you want to return to the previous software load you were running before activating the new release.

  6. — Complete this procedure only if you want to upgrade to a new release using Transaction Language (TL1).

NTP-U487 Preparing to Upgrade to a New Release

Purpose

This procedure provides critical information checks and tasks you must complete before beginning an upgrade to the latest release.

Tools/Equipment

Cisco ONS 15454 SDH nodes

Prerequisite Procedures

"DLP-G46 Log into CTC" in the "Connect the PC and Log into the GUI" document.

Required/As Needed

Required

Onsite/Remote

Onsite or remote

Security Level

Superuser

Procedure


Step 1

Before you begin, make sure that information related to your site, for example, date, street address, site phone number, and dialup number are stored in a safe and accessible location. The data will be useful during and after the upgrade.

Step 2

Read the release notes of the release you are upgrading to. Visit Release Notes to download the release notes.

Step 3

Ensure your workstation meets the minimum hardware and software requirements before starting the upgrade. For more information on the hardware and software requirements, read the release notes.

Step 4

Refer to the Software Upgrade Matrix to verify if the upgrade path is supported.

Step 5

Make sure that the control cards are installed in the appropriate slots on all the nodes in the network and on both the slots as indicated here. For a complete list of supported control cards, see Supported Control Cards:

  • ONS 15454 SDH shelf -

    • cards are in Slots 7 and 11

  • ONS 15454 M6 shelf — cards in Slots 1 and 8

  • ONS 15454 M2 shelf— cards in Slot 1

Step 6

Repeat the above step for every node in the network.

Step 7

Collect the node diagnostics logs from the node. This action is very useful incase the upgrade fails, as the diagnostics help in understanding if the node had issues before the upgrade.

Step 8

Export the current alarms and conditions to your local storage. After the upgrade, if new alarms or conditions arise, then comparing the time stamp of the alarm to the previously saved time stamp helps in identifying new alarms or conditions.

Step 9

Perform a backup of the node database. This is very useful incase the upgrade fails, then the database can be restored using the backup. The detailed procedure for backing up the database is discussed in the next section.

Stop. You have completed this procedure.


NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database

Purpose

This procedure retains all configuration data for your network before performing the upgrade.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

Required/As Needed

Required

Onsite/Remote

Onsite or remote

Security Level

Superuser

Procedure


Step 1

In the node view, click the Maintenance>Database tabs.

Step 2

In the database pane, click the Backup button.

The Database Backup dialog box is displayed.

Step 3

Click Browse. Navigate to the local PC directory or network directory and type a database name using the IP address of the node to upgrade (such as database15454SDH010107.db) in the File Name field and click OK. To overwrite an existing file, click Yes.

Step 4

When the backup is complete, click OK.

Step 5

Repeat Steps 1 through 5 for each node in the network.

Step 6

(Optional) It is recommended that you manually log critical information by either writing it down, printing screens, or by exporting the data to an appropriate format, as applicable. Use the following table to determine the information that should be logged.

Information

Record Data Here

IP address of the node

Node name

Timing settings

DCC1 connections—list all optical ports with active DCCs

User IDs of all users, including at least one Superuser

Inventory—A print screen of the Inventory window

Active card

ONS 15454 - Slot 7 and Slot 11

ONS 2006 - Slot 1 and Slot 8

NCS 2015 - Slot 1 and Slot 17

Network information—A print screen of the Provisioning tab in the network view

List all protection groups in the system—A print screen of the Protection group window

List alarms—A print screen of the Alarm window

List circuits—A print screen of the Circuit window

1 DCC=data communications channel

Stop. You have completed this procedure.


NTP-U489 Upgrade the Cisco ONS 15454 SDH Software

Purpose

This procedure upgrades the CTC software to R11.1 and must be performed on all nodes, or groups of nodes to be upgraded.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database

Required/As Needed

Required

Onsite/Remote

Onsite or remote

Security Level

Superuser


Caution

Do not perform maintenance or provisioning activities during the activation task.



Note

During the upgrade of R8.0 or R8.5.x to a later release, if path protection circuits of type UPSR_DRI or 2waydc was created on an ADM-10G card, any existing software provisioning on the card is lost. Therefore, make sure that these path protection circuit types are not present before you upgrade to a later release.



Note

The ADM-10G card does not support adding drops to existing Synchronous Transport Signal (STS) circuits. Therefore, when upgrading from R8.0 to a later release, delete any STS circuits with multiple drops on the ADM-10G card.


Procedure


Step 1

Insert the software CD into the workstation CD-ROM drive (or otherwise acquire access to the software) to begin the upgrade process.

Note 

Inserting the software CD activates the CTC Java Setup Wizard. Use the setup wizard to install the components or click Cancel to continue with the upgrade.

Step 2

Complete the DLP-U546 Download the ONS 15454 SDH Software task for all nodes to be upgraded.

Step 3

Complete the DLP-U548 Activate the New Cisco ONS 15454 SDH Software task for all nodes to be upgraded.

Note 

Only one node can be activated at a time. During a parallel upgrade, activate another node as soon as the controller cards reboot successfully. To perform parallel upgrade remotely, wait five minutes for the controller cards to reboot completely.

Step 4

Complete the DLP-U549 Delete Cached JAR Files task, as necessary.

Step 5

(Optional) If you want to prevent a software revert to an earlier software release, complete the DLP-U546 Download the ONS 15454 SDH Software task on all nodes, or groups of nodes you are upgrading a second time.

Caution 

If the software is downloaded again after a version is activated, a revert to the previous version cannot be performed.

Step 6

If you need to return to the software and database you had before activating Software R11.1, proceed with the NTP-U491 Restore the Previous Software Load and Database procedure.

Note 

When you upgrade a TCC2 card to a TCC2P, the SFTWDOWN alarm can be raised and cleared more than once before the software download is complete. For example, when you remove the standby TCC2 card in Slot 11 and replace it with a TCC2P card, the SFTWDOWN alarm occurs within moments of this replacement. It can briefly clear and then occur again before the alarm is finally cleared at the end of the upgrade process.

Note 

When you upgrade a TCC2P card to a TCC3, the SFTWDOWN alarm can be raised and cleared more than once before the software download is complete. For example, when you remove the standby TCC2P card in Slot 11 and replace it with a TCC3 card, the SFTWDOWN alarm occurs within moments of this replacement. It can briefly clear and then occur again before the alarm is finally cleared at the end of the upgrade process

Step 7

To back up the Software R11.1 database for the working software load, see NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database procedure in order to preserve the database for the current release.

After the upgrade is complete, the date and time in CTC is reset.

Stop. You have completed this procedure.


What to do next

After upgrading the software to a different build, if there is a change in the FPGA, the FPGA is upgraded automatically. During the FPGA upgrade process, the card goes for a cold reboot. If Optical Supervisory Channel (OSC) is provisioned, then the transient PPM-IMPROPER-REMOVAL alarm is raised, which gets cleared in a short span of time. This happens because of the power glitches to the PPM while the card is coming up after the cold reboot.

DLP-U546 Download the ONS 15454 SDH Software

Purpose

This task downloads software to the ONS 15454 SDH nodes before activation.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database

Required/As Needed

Required

Onsite/Remote

Onsite or remote

Security Level

Maintenance user or higher


Note

The control card contains flash memory with two partitions—Working and protect (backup). The software is downloaded to the protect (backup) partition of the flash memory on both the standby and active cards. This download is not traffic affecting because the active software continues to run in the primary RAM location. The software can therefore be downloaded at any time.



Note

To download and upgrade the software using TL1, see the procedure.


Procedure


Step 1

From CTC View menu, choose Go to Network View.

Step 2

Make sure that the alarm filter is turned off. To do so, complete the following:

  1. Click the Filter tool that is located at the lower-left side of the window.

    The Alarm Filter dialog box appears.

  2. Click to select any check box that is not selected in the Show Severity section of the General tab.

Step 3

Resolve any outstanding alarms. To view alarms for all the nodes in the network, click the Alarms tab.

Note 

The SFTWDOWN alarm is raised on the standby and active control cards during software download. The alarms clear when the download is complete.

Step 4

From the CTC View menu, choose Go to Home View to go to the node view.

Step 5

Click the Maintenance> Software tabs.

Step 6

Click the Download button. The Download Selection dialog box appears.

Step 7

Locate the software files on the software CD or on your hard drive.

Step 8

To open the Cisco ONS 15454 SDH folder, choose the file with the PKG extension and click Open.

Step 9

From the list of compatible nodes, select the nodes where the software must be downloaded.

Note 

It is recommended that simultaneous software downloads on the section data communications channel (SDCC) be limited to eight nodes at a time, using the central node to complete the download. If more than eight concurrent software downloads are selected at a time, it is placed in a queue.

Step 10

Click OK. The Download Status column monitors the progress of the download.

Step 11

Return to your originating procedure (NTP).


DLP-U548 Activate the New Cisco ONS 15454 SDH Software

Purpose

This task activates the software on each node in the network.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

DLP-U546 Download the ONS 15454 SDH Software

Required/As Needed

Required

Onsite/Remote

Onsite or remote

Security Level

Superuser


Note

It is recommended that the first node that is activated be connected via LAN. This ensures that the new CTC JAR files download to the workstation as quickly as possible.

If a node is provisioned to have no LAN access, the value is overridden in the case of node isolation. Additionally, if the node is not reachable, the LAN access is turned on. It is recommended that you avoid node isolation.



Note

During the activation process, when the node is being upgraded to R11.0 (and later releases), the USB-MOUNT-FAIL alarm is raised. In MSM, the USB-MOUNT-FAIL alarm is raised on all subtended shelf controllers and the node controller. When all the subtended shelf controllers and the node controller complete the upgrade successfully, the USB-MOUNT-FAIL alarm is cleared. No manual intervention is required to clear the USB-MOUNT-FAIL alarm. After the USB-MOUNT-FAIL alarm is cleared, USB sync is triggered. After USB sync is successfully completed, the node is migrated to the latest software successfully.


Procedure


Step 1

If CTC is not already started, start CTC.

Step 2

Record the IP address of the node. The IP address can be obtained either on the LCD or on the upper left corner of the CTC window.

Step 3

Make sure that the alarm filter is turned off. To do so, complete the following:

  1. Click the Filter tool at the lower-left side of the window.

    The Alarm Filter dialog box appears.

  2. Click to select any check box that is not selected in the Show Severity section of the General tab.

Step 4

Make sure that all cards that are part of a 1+1 or Y-cable protection group must be active on the working card of the protection group and no protection switches are occurring. Also, ensure that traffic carrying protect cards are in a standby state. To do so, complete the following:

  1. In the node view, click Maintenance > Protection tabs.

  2. Select each protection group listed and view the active or standby status of each card in the Selected Group area.

Step 5

In shelf view, click the Maintenance > Software tabs.

Step 6

Verify that the version in the Protect Version column is .

Step 7

Click the Activate button. The Activate dialog box displays a warning message.

Step 8

Click Yes to proceed with the activation.

During node activation, all the common control cards in the node reboot beginning with the standby card. As soon as the standby card recovers from the reboot, it signals the active card to reset as a standby card and the standby card transitions to active. An Activation Successful message indicates that the software is successfully activated.
Step 9

Click OK.

The connection between CTC and the node is lost and CTC displays the Network view. The INCOMPATIBLE-SW alarm is raised in CTC for the first node that is activated because CTC is unable to connect to the NE due to differing, incompatible versions of the software between CTC and the NE. A CTC alert is displayed to update the CTC software. To clear the INCOMPATIBLE-SW alarm, perform steps 10 through 12 only for the first node that is activated on the network.

During the activation process:

  • The SYSBOOT alarms are raised when the common control cards and cross-connect card reset. These alarms clears when all the cards reset.

    The activation process can take up to 30 minutes, depending on the number of cards installed in the node.

  • The GCC-EOC, EOC, and EOC-E alarms are transient. These alarms are raised and cleared during the upgrade process when the control cards and line cards reset.

  • Protect cards in the Y-cable protection group boot next, in the order that the protection group was created.

  • Other line cards reset one after the other in the order of slot number.

If you are upgrading remotely and cannot see the nodes, wait for 5 minutes for the process to complete, then check to ensure that related alarms have cleared before proceeding.

Step 10

In CTC, choose File > Update CTC. The CTC software is updated. A CTC alert is displayed to restart CTC.

Step 11

In CTC, choose File > Exit.

Step 12

Start CTC again.

Step 13

(Optional) Run the Cache Loader pre-caching utility. This logs you into CTC at a faster pace after an upgrade. However, you must log into nodes running releases prior to Software R4.6.

Note 

If you do not plan to run the pre-caching utility, it is recommended that the first node you activate be a LAN-connected node. This ensures that the new CTC JAR files download to your workstation as quickly as possible.

Perform the following steps to run the Cache Loader.

  1. Load the Software CD into your CD-ROM drive. If the directory of the CD does not open automatically, open it.

  2. Double-click the setup.exe file to run the Installation Wizard. The CTC Installation Wizard dialog box appears.

  3. Click the Next button. The Setup Options dialog box appears.

  4. Choose Custom, and click the Next button. The Custom Options dialog box appears.

  5. Click to select Cisco Transport Controller, and CTC JAR files (deselect any other preselected options) and click the Next button. A confirmation dialog box appears.

  6. Click the Next button again. The CTC Cache Loader pre-caches the JAR files to your workstation, displaying a progress status box.

  7. When the utility finishes, click OK, and in the wizard, click Finish.

Step 14

Click the Launch CTC button in the CTC launcher window.

The new CTC applet loads. The login window is displayed.

Step 15

Type the user name and password and click Login.

Step 16

Return to your originating procedure (NTP).


DLP-U549 Delete Cached JAR Files

Purpose

This task deletes cached JAR files.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

None

Required/As Needed

You need to complete this task after you activate the first network node.

Onsite/Remote

Onsite or remote

Security Level

Maintenance user or higher


Note

Whenever the CTC software is upgraded or reverted, make sure that the browser and hard drive cache files are cleared.


Procedure


Step 1

Delete cached files from your browser directory.

In Netscape:

  1. Select Edit > Preferences. Click the Advanced tab and click the Cache button.

  2. Click the Clear Memory Cache button, and click OK.

  3. Click the Clear Disk Cache button, and click OK twice.

In Microsoft Internet Explorer:

  1. Select Tools > Internet Options. The Internet Options dialog box appears.

  2. Click the General tab, and then click the Delete Files button.

  3. Select the Delete all offline content check box.

  4. Click OK twice.

Step 2

Close the browser.

Note 
Cached JAR files cannot be deleted from the hard drive until the browser is closed. Other applications that use JAR files must also be closed.
Step 3

On Windows systems, delete cached files from your workstation in this location:

C:\Documents and Settings\username\Application Data\Cisco\CTC
Step 4

Reopen the browser. You should now be able to connect to CTC.

Step 5

Return to your originating procedure (NTP).


DLP-U551 Set the Date and Time

Purpose

This task sets the date and time. If you are not using SNTP, the upgrade procedure can cause the Date/Time setting to change. Perform this task to reset the date and time at each node.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

None

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Superuser


Note

If you are using SNTP, this task is not applicable.


Procedure


Step 1

In CTC node view, click the Provisioning > General tabs.

Step 2

Set the correct date and time. Click Apply .

Step 3

Repeat Steps 1 and 2 on all the remaining nodes.

Step 4

Return to your originating procedure (NTP).


NTP-U490 Install Public-Key Security Certificate

Purpose

This procedure installs the ITU Recommendation X.509 public-key security certificate. The public-key certificate is required to run software R4.1 or later.

Tools/Equipment

None

Prerequisite Procedures

This procedure is performed when logging into CTC. You cannot perform it at any other time.

Required/As Needed

This procedure is required to run software R4.1 or later.

Onsite/Remote

Onsite or remote

Security Level

Provisioning or higher

Procedure


Step 1

Log into CTC.

Step 2

If the Java Plug-in Security Warning dialog box appears, choose one of the following options:

  • Grant This Session—Installs the public-key certificate on the PC only for the current session. After the session ends, the certificate is deleted. This dialog box appears at the next login into the node.

  • Deny—Denies permission to install the certificate. If this option is chosen, login into the node is denied.

  • Grant always—Installs the public-key certificate and does not delete it after the session is over. It is recommended to use this option.

  • View Certificate—The public-key security certificate is displayed.

After the completion of the security certificate dialog boxes, the web browser displays information about the Java and system environments. If this is the first login, a CTC downloading message appears while CTC files are downloaded to the computer. The process can take several minutes, if it is the first time. After the download, the CTC Login dialog box appears.

Step 3

Return to the software and database you had before activating the software, proceed with the NTP-U491 Restore the Previous Software Load and Database procedure.

Stop. You have completed this procedure.


NTP-U491 Restore the Previous Software Load and Database

Purpose

This procedure returns to the software and database provisioning that was present before R11.1 was activated.

The software load and database cannot be restored to the previous version if the software on both the working and protect cards were upgraded to R11.1.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

"DLP-G46 Log into CTC" in the "Connect the PC and Log into the GUI" document.

NTP-U487 Preparing to Upgrade to a New Release

NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database

NTP-U489 Upgrade the Cisco ONS 15454 SDH Software

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Superuser


Note

Tasks to revert to a previous load are not part of the upgrade, and are provided here as a convenience to those wishing to perform a revert after an upgrade. If you have successfully performed all necessary procedures up to this point, you have finished the software upgrade.



Caution

If a node is set to secure, dual-IP mode, the database information is overwritten with this configuration and cannot be reverted to single-IP repeater mode.



Note

All line cards of the subtended shelf controller may undergo a reboot during a software revert from Release 11.0 or earlier to a previous software release and is traffic impacting.


Procedure


Step 1

Complete the DLP-U552 Revert to Protect Load task.

Step 2

If the software revert to your previous release failed to restore the database, complete the DLP-U553 Manually Restore the Database task.

Stop. You have completed this procedure.


DLP-U552 Revert to Protect Load

Purpose

This task reverts to the software you were running prior to the last activation.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

NTP-U487 Preparing to Upgrade to a New Release

NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database

NTP-U489 Upgrade the Cisco ONS 15454 SDH Software

Required/As Needed

Required for revert

Onsite/Remote

Onsite or remote

Security Level

Superuser


Note

To perform a supported (non-service-affecting) revert from , the release you want to revert to must have been working at the time you activated to the current software version on that node. Also, a supported revert automatically restores the node configuration at the time of the previous activation. The exception to this is when you have downloaded a second time, ensuring that no revert to a previous load can take place. In this case, the revert occurs, but is not traffic-affecting and does not change the database.



Note

Ensure that all cards that are part of a protection group (1+1 or Y-cable) are active on the working card of that protection group and that no protection switches are occurring. To ensure that traffic carrying protect cards are in a standby state, in the node view click the Maintenance tab, and view the Protect column for each of the listed protection groups. View the active/standby status of each card in the Maintenance tab.


Procedure


Step 1

From the node view, click the Maintenance tab, then click the Software button.

Step 2

Verify that the protect software displays the release you upgraded from.

Step 3

Click the Revert button. Revert activates the protect software and restores the database from the previous load. A confirmation dialog box appears.

Note 

Any FPGA downgrades during the revert process may affect traffic. Configuration changes made after activation are lost when you revert.

Step 4

Click OK. This begins the revert process and drops the connection to the node.

Step 5

Wait until the software revert completes before continuing.

Note 

The system reboot may take up to 30 minutes to complete.

Step 6

Wait one minute before reverting another node.

Step 7

After reverting all the nodes in the network, restart the browser and log back into the last node that was reverted. This uploads the appropriate CTC applet to your workstation.

Step 8

Perform the DLP-U549 Delete Cached JAR Files task.

Step 9

Return to your originating procedure (NTP).


DLP-U553 Manually Restore the Database

Purpose

This task manually restores the database. Use this task if you were unable to perform a revert successfully and need to restore the database.

Tools/Equipment

PC or UNIX workstation

Prerequisite Procedures

DLP-U552 Revert to Protect Load

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Superuser


Caution

Do not perform these steps unless the software revert failed.



Caution

This process is service affecting and should be performed during a maintenance window.


Procedure


Step 1

In CTC node view, click the Maintenance tab, then click the Database button.

Step 2

Click the Restore button. The DB Restore dialog box appears.

Step 3

Click Browse to locate the database file stored on the workstation hard drive or on network storage.

Step 4

Click the database file to highlight it and click Open. The DB Restore dialog box appears.

Step 5

If you need a complete database restore, check the Complete database (System and Provisioning) checkbox.

Note 

The following parameters are restored only when the Complete Database (System and Provisioning) checkbox is checked: node name, IP address, subnet mask and gateway, and IIOP port. If you change the node name and then restore a backed up database on this node, the circuits automatically map to the newly renamed node. It is recommended to keep a record of the old and new node names.

Step 6

Click Ok.

The database is restored and the control cards reboot.

Step 7

When the control cards have finished rebooting, log into CTC and verify that the database is restored.

Wait one minute before restoring the next node.

Step 8

Repeat Steps 1 to 7 for each node in the network.

You have now completed the manual database restore.

Note 

When the complete database is restored, the node does not report an event regarding the IP change; the node reboots and configures the new IP from the database. If the IP address being restored is not in the CTC network IP addressing scheme, you might lose visibility of the node. To resolve this, you must launch CTC with the IP mentioned in the table against the database backup. Refer to the table, “Manually Recorded Data” in the NTP-U488 Back Up the Cisco ONS 15454 SDH Software Database procedure for more information.

Step 9

Return to your originating procedure (NTP).


Obtaining Documentation and Submitting a Service Request

For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly What's New in Cisco Product Documentation, which also lists all new and revised Cisco technical documentation, at: http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html

Subscribe to the What's New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS version 2.0.

Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: https://www.cisco.com/c/en/us/about/legal/trademarks.html. Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (1721R)