The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
This appendix includes the following sections:
Planning the location and layout of your equipment rack is essential for successful equipment operation, ventilation, and accessibility.
This table lists the site planning tasks that we recommend that you complete before you install the Cisco UCS equipment. Your completion of each task ensures a successful installation.
Use this checklist to record environmental information for the installation site.
Use this checklist to record information about the power setup and requirements.
Use this checklist to record information about LAN connectivity.
Are the required optics available on the customer’s SAN switch to provide FC connectivity to the UCS Fabric Interconnect? |
||
Are the required cables available to connect the customer’s SAN switch to the UCS system? For example, “UCS Fabric Interconnect FC optic is SFP-10G-SR.” |
If yes, what are the length, type (fiber or copper), and quantity? |
|
5 |
What is the agreed upon plan to rectify the outstanding SAN connectivity issues? Include any notes needed by the implementation team. |
Use this checklist to record information about the cabling between fabric interconnects and chassis’.