Dynamic and ADC Charging Rule Names

Revision History


Note

Revision history details are not provided for features introduced before release 21.24.


Revision Details

Release

First introduced

Pre 21.24

Feature Description

With this feature, the Operators can support Mobility Services Platform (MSP) functional use cases.

This feature covers the following requirements:

  • Support of 64 rules is for:

    • Dynamic rules on default bearer with flow descriptions.

    • ADC rules with and without flow descriptions.

  • Up to 174 PDRs, and it’s corresponding FARs, URRs and QERs, are supported for static rules, predefined rules, dynamic rules, and ADC rules.

    • Up to 206 URRs are supported for static rules, predefined rules, dynamic rules, and ADC rules.

  • All rules information is communicated to User Plane using Create PDR, Create URR, Create FAR and Create QER.

  • All Sx messages supports the required number of PDR, URR, FAR, QER and Usage report, Query URR.

  • Monitor protocol displays all Sx messages.

  • Monitor subscriber displays all Sx messages.