Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful switch operation, ventilation, and accessibility. The following table lists the site planning tasks we recommend that you complete before installing the Cisco MDS 9220i Switch.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Task No. |
Planning Activity |
Verified By |
Time |
Date |
---|---|---|---|---|
1 |
Space evaluation:
|
|||
2 |
Environmental evaluation:
|
|||
3 |
Power Evaluation:
|
|||
4 |
Grounding evaluation:
|
|||
5 |
Cable and interface equipment evaluation:
|
|||
6 |
Electromagnetic interference (EMI) evaluation:
|
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
3. RFI = radio frequency interference.