Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation, ventilation, and accessibility.
Table 1 lists the site planning tasks that we recommend that you complete before you install the Cisco Nexus 7000 Series switch. Your completion of each task ensures a successful switch installation.
Planning Activity |
Verification Time and Date |
---|---|
Space evaluation:
|
|
Environmental evaluation:
|
|
Power evaluation:
|
|
Grounding evaluation:
|
|
Cable and interface equipment evaluation:
|
|
EMI evaluation:
|
|