Repacking the Switch
If you need to return or move the switch chassis, follow these steps to repack the switch using the original packaging material.
Procedure
Step 1 |
Set the chassis in the bottom pallet. |
||
Step 2 |
Place the packing bag over the chassis. |
||
Step 3 |
Place the front-packing material and power supply packing material around the chassis. |
||
Step 4 |
Place the power supplies in the spaces provided in the power supply packing material. |
||
Step 5 |
Place the top-packing material over the top of the chassis and power supplies. |
||
Step 6 |
Place the rack-mount kit and the accessory kit on the top-packing material.
|
||
Step 7 |
Place the outside carton over the entire package. |
||
Step 8 |
Fold the outside carton down over the top and seal with packing tape. |
||
Step 9 |
Wrap three packing straps tightly around the top and bottom of the package to hold the outside carton and the bottom pallet together. |