Site Preparation Checklist
Planning the location and layout of your equipment is essential for successful system operation, ventilation, and accessibility.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Task No. |
Planning Activity |
Verified By |
Time |
Date |
---|---|---|---|---|
1 |
Space evaluation:
|
|||
2 |
Environmental evaluation:
|
|||
3 |
Power evaluation:
|
|||
4 |
Grounding evaluation:
|
|||
5 |
Cable and interface equipment evaluation:
|
|||
6 |
EMI evaluation:
|