Shutting Down the Cisco APIC System
This procedure shuts down the Cisco Application Policy Infrastructure Controller (APIC) system. After you shut down the system, you will relocate the entire fabric and power it up, then update the time zone and/or NTP servers accordingly.
Before you begin
Ensure cluster health is fully fit.
Procedure
Step 1 |
On the menu bar, choose . |
Step 2 |
In the Navigation pane, choose . |
Step 3 |
Right-click the Cisco APIC and choose Shutdown. |
Step 4 |
Relocate the Cisco APIC, then power it up. |
Step 5 |
Confirm that the cluster has fully converged. |
Step 6 |
Repeat this procedure for the next Cisco APIC. |