Configure the Bridge and Roll

Bridge allows data to setup a link to another path when original path requires any maintenance. After the maintenance of the original path, Roll allows to revert the path. This chapter provides the CTC procedures to configure the bridge and roll.

Configure Bridge and Roll Using CTC

Purpose

Bridge allows setup a link between two temporary paths when the main path requires any maintenance. Rolls allows to get revert the temporary path once maintenance done of the main path. This chapter provides the CTC procedures to configure the bridge and roll.

Tools/Equipment None
Prerequisite Procedures
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher

Procedure


Perform any of the following procedures as needed to configure the bridge and roll:

Stop. You have completed this procedure.


Add an Explicit Path to an unprotected OTN Circuit for a Roll Over Using CTC

Purpose

This procedure enables you to add an explicit path to an unprotected OTN circuit for a roll over for NCS4K-20T-O-S, NCS4K-2H-O-K,NCS4K-24LR-O-S, NCS4K-2H10T-OP-KS, and NCS4K-4H-OPW-QC2 line cards, using CTC.

Adding an Explicit Path allows to roll over into the original path.

Tools/Equipment

None

Prerequisite Procedures

"Login to CTC" in System Setup and Software Installation Guide for Cisco NCS 4000 Series.

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Onsite/Remote

Provisioning or higher

Procedure


Step 1

In the Network View, double-click the line card.

Step 2

Click the OTN > Circuit tab.

Step 3

Select a circuit from the list.

Step 4

From the Tools menu, choose Circuit.

Step 5

Click Roll Circuit. Perform the following steps in the Select a Member Circuit to Roll screen that appears.

Note

 
The roll, a circuit feature is not from the node perspective but from the CTC session perspective. If the session is closed in between, information about rolls cannot be recovered.
  1. From the Explicit Path drop-down list, choose an explicit path that you want to add to the selected circuit.

  2. Click Add to add the selected explicit path to the circuit

Step 6

Return to your originating procedure.


Perform a Manual Switch Using CTC

Purpose

This procedure enables you to perform a manual switch for NCS4K-20T-O-S, NCS4K-2H-O-K,NCS4K-24LR-O-S, NCS4K-2H10T-OP-KS, and NCS4K-4H-OPW-QC2 line cards, using CTC. Manual Switch allows the traffic to switch from the working path to the protected path.

Tools/Equipment

None

Prerequisite Procedures

"Login to CTC" in System Setup and Software Installation Guide for Cisco NCS 4000 Series.

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Provisioning or higher

Procedure


Step 1

In the Network View, double-click the line card.

Step 2

Click the OTN > Rolls tab.

Step 3

Select a circuit from the list.

Step 4

Click Manual Switch Over.

The traffic is switched from the working path to the protected path.

Step 5

Return to your originating procedure.