NTP-L60 Performing NCS 2015 Shelf Installation Acceptance Test
Purpose |
Use this procedure to perform a shelf installation acceptance test for the NCS 2015 shelf. |
Tools/Equipment |
Voltmeter |
Prerequisite Procedures |
None |
Required/As Needed |
Required |
Onsite/Remote |
Onsite |
Security Level |
None |
Procedure
Step 1 |
If you installed an NCS 2015 shelf, complete the table below by verifying that each applicable procedure was completed.
|
||||||||||||||||||||
Step 2 |
Complete the DLP-L63 Inspecting the Shelf. |
||||||||||||||||||||
Step 3 |
Continue with Connect the PC and Log into the GUI. Stop. You have completed this procedure. |