- Preface
- Overview
- Preparing to Install the Cisco NCS 2002, NCS 2006, and NCS 2015 Shelf
- Cisco NCS 2002 Installation Overview
- Installing the Air Flow Regulator
- Mounting the Cisco NCS 2002 Brackets
- Mounting the Cisco NCS 2002 Shelf
- Connecting Power and Ground
- Connecting and Routing the Cables and Wires
- Cisco NCS 2002 Shelf Installation Acceptance Test
- Installing the Cisco NCS 2002 Door and Other Modules
- NCS 2006 Installation Overview
- Installing the Air Flow Regulator
- Mounting the Brackets on NCS 2006 Shelf
- Mounting the Cisco NCS 2006 Shelf
- Connecting Power and Ground
- Connecting and Routing the Cables
- NCS 2006 Shelf Installation Acceptance Test
- Installing the Cisco NCS 2006 Door and Other Modules
- NCS 2015 Installation Overview
- Mounting the Brackets on the NCS 2015 Shelf
- Mounting the Cisco NCS 2015 Shelf
- Connecting Power and Ground
- Connecting and Routing the Cables
- NCS 2015 Shelf Installation Acceptance Test
- Installing the Cisco NCS 2015 Door and Other Modules
- Installing and Configuring the Control Card
- Multishelf Management
- Maintaining the NCS 2002, NCS 2006, and NCS 2015 Shelves
- Hardware Specifications
- Index
Contents
* - A - B - C - D - E - F - G - I - L - M - N - O - P - R - S - T - U - V - W
Index
*
A
acceptance testsshelf connections 1shelf installation 1air filter, description 1B
blade. See card 1C
Card Slot Requirements 1cardsreplacement 1slot requirements 1changingCisco NCS 2015 shelfoverview 1cleaningfiber adaptors 1fiber connectors 1CLETOP 1clockconnectingground to ETSI shelf 1multishelf node and subtending shelves to an MS-ISC-100T card 1power to ETSI shelf 1CTCverifying software release 1D
dateE
Electrostatic Discharge and Grounding Guide for Cisco Cisco CPT and Cisco ONS Platforms 1 2 3 4 5 6 7 8 9 10 11 12 13 14F
fan-tray assemblydescription 1replacing 1fansfibercleaning adapters 1cleaning connectors 1filler cardsflange 1front doorlabel (ANSI) 1opening 1fuse and alarm panellocation (ANSI) 1G
groundconnecting to ETSI shelf 1I
inspectingshelf assembly 1installationacceptance test 1installingTCC2/TCC2P card 1L
LAN cableconnecting nodes in multishelf mode 1LCDverifying software version 1M
measuringvoltage 1module. See card 1mountingmounting bracketsMS-ISC-100T cardconnecting to a shelf 1multishelf modeconnecting shelves 1N
NCS 2015air filter 1ANSI rack installation 1connecting office power 1ETSI rack installation 1external connection units 1fan-tray assembly 1front door 1installation overview 1installing deep door 1installing fan-tray assembly 1installing power and ground 1installing power modules 1installing standard door 1installing the ECU 1LCD unit 1mounting brackets for ANSI rack 1mounting brackets in ETSI rack 1mounting shelf 1multishelf management 1power modules 1removing the door 1replacing air filter 1replacing fan-tray assembly 1shelf specifications 1slot symbols 1NTP-G38 Provision OSC Terminations, page 5-121 1O
openingfront door 1P
powerconnecting office power to ETSI shelf 1measuring voltage 1See also ground [powerR
rackreversible mounting bracketinstallationSee also rack [installationremovingreplacingfan-tray assembly 1resettingS
ShelfVoltage 1shelf assemblyunpacking and inspecting 1verifying 1slotsrequirements 1softwareverifying software version 1T
TCC2 cardinstalling 1TCC2P cardinstalling 1TemperatureShelf 1third-party equipmentTNC cardconfiguring UDC and VoIP 1installing 1provisioning PPM and port 1TNCS cardconfiguring UDC and VoIP 1installing 1provisioning PPM and port 1TSC cardinstalling 1U
unpacking the shelf assembly 1V
verifyingshelf assembly 1shelf ground and power 1software version 1VoltageShelf 1voltage, measuring 1voltmeterverifying the office ground and power 1verifying the shelf and ground power wiring 1W
warnings