Index

Contents

* - A - B - C - D - E - F - G - I - L - M - N - O - P - R - S - T - U - V - W

Index

*

*** 1 2 3 4 5

A

acceptance tests
shelf connections 1
shelf installation 1
air filter, description 1

B

blade. See card 1

C

Card Slot Requirements 1
cards
replacement 1
slot requirements 1
symbol and slot correspondence 1 2 3
changing
rack size 1 2 3
Cisco NCS 2015 shelf
overview 1
cleaning
fiber adaptors 1
fiber connectors 1
CLETOP 1
clock
resetting 1 2 3 4 5 6
coating bare power conductors 1 2 3 4
connecting
ground to ETSI shelf 1
multishelf node and subtending shelves to an MS-ISC-100T card 1
power to ANSI shelf 1 2 3
power to ETSI shelf 1
CTC
verifying software release 1
cutting fuse and alarm cables 1 2 3

D

date
default 1 2

E

Electrostatic Discharge and Grounding Guide for Cisco Cisco CPT and Cisco ONS Platforms 1 2 3 4 5 6 7 8 9 10 11 12 13 14
ESD plug input 1 2 3

F

fan-tray assembly
description 1
fan failure 1 2 3
fan speed 1 2 3 4
installing 1 2
replacing 1
fans
failure 1 2 3
speed 1 2 3
fiber
cleaning adapters 1
cleaning connectors 1
filler cards
description 1 2 3
flange 1
front door
label (ANSI) 1
opening 1
removing 1 2
fuse and alarm panel
description 1 2 3
location (ANSI) 1
measuring and cutting cables 1 2 3
verifying office battery and ground 1 2 3

G

ground
ANSI 1 2 3
connecting to ETSI shelf 1
ETSI 1 2 3
installing 1 2 3
verifying before turning on office power 1 2

I

inspecting
shelf assembly 1
installation
acceptance test 1
overview 1 2 3
installing
fan-tray assembly 1 2
ground 1 2 3
shelf assembly 1 2
TCC2/TCC2P card 1

L

LAN cable
connecting nodes in multishelf mode 1
laser warning 1 2 3
LCD
verifying software version 1

M

measuring
fuse and alarm cables 1 2 3
voltage 1
module. See card 1
mounting
multiple nodes in a rack 1 2
shelf assembly in a rack (one person) 1 2
shelf assembly in a rack (two people) 1 2
single node in a rack 1 2
mounting brackets
reversing the brackets to covert the rack size 1 2 3
mounting brackets, description 1 2 3
MS-ISC-100T card
connecting to a shelf 1
multishelf mode
connecting shelves 1

N

NCS 2015
air filter 1
ANSI rack installation 1
connecting office power 1
ETSI rack installation 1
external connection units 1
fan-tray assembly 1
front door 1
installation overview 1
installing deep door 1
installing fan-tray assembly 1
installing power and ground 1
installing power modules 1
installing standard door 1
installing the ECU 1
LCD unit 1
mounting brackets for ANSI rack 1
mounting brackets in ETSI rack 1
mounting shelf 1
multishelf management 1
power modules 1
removing the door 1
replacing air filter 1
replacing fan-tray assembly 1
shelf specifications 1
slot symbols 1
NTP-G24 Set Up Name, Date, Time, and Contact Information, page 5-15 1 2 3
NTP-G38 Provision OSC Terminations, page 5-121 1

O

office power. See power 1 2 3
opening
front door 1

P

power
coating bare conductors 1 2 3 4
connecting office power to ANSI shelf 1 2 3
connecting office power to ETSI shelf 1
measuring voltage 1
See also ground [power
zzz] 1 2
turning on and verifying office power 1 2 3 4 5

R

rack
converting the rack size 1 2 3
installation overview (ANSI) 1 2 3
installation overview (ETSI) 1 2
mount a single node (ANSI) 1 2 3
mount multiple nodes (ANSI) 1 2
mounting a single node 1 2 3 4
mounting a single node (ETSI) 1 2
mounting multiple nodes (ETSI) 1 2
reversible mounting bracketinstallation
See also rack [installation
removing
front door 1 2
replacing
fan-tray assembly 1
resetting
TCC2/TCC2P card clock 1 2 3 4
reversing the mounting brackets 1 2 3

S

Shelf
Voltage 1
shelf assembly
ANSI, description 1 2 3
ANSI, dimensions 1 2 3
ETSI, description 1 2
ETSI, dimensions 1 2 3
ETSI, mounting 1 2 3
installing 1 2
mounting in a rack 1 2 3 4
unpacking and inspecting 1
verifying 1
slots
requirements 1
software
verifying software version 1

T

TCC2 card
clock reset 1 2 3 4
installing 1
TCC2P card
clock reset 1 2 3 4
installing 1
Temperature
Shelf 1
third-party equipment
fuse and alarm panels 1 2 3
TNC card
configuring UDC and VoIP 1
installing 1
provisioning PPM and port 1
TNCS card
configuring UDC and VoIP 1
installing 1
provisioning PPM and port 1
TSC card
installing 1
turning on office power 1 2 3 4 5

U

unpacking the shelf assembly 1

V

verifying
ground 1 2
office power 1 2 3 4 5
shelf assembly 1
shelf ground and power 1
software version 1
Voltage
Shelf 1
voltage, measuring 1
voltmeter
verifying office battery and ground 1 2 3
verifying the office ground and power 1
verifying the shelf and ground power wiring 1
verifying the shelf for –48 VDC 1 2 3

W

warnings
laser 1 2 3